Guides / Driveway permits
Driveway Permits Central Coast: VAC Approval Guide
A new driveway does not automatically come with permission to build its public crossing. Central Coast Council calls that road-reserve section a vehicle access crossing, or VAC. Its consent is separate from the development application or complying development certificate for the property.
Official sources checked 14 October 2026. This is an independent referral guide, not a council application or approval.
Start with the VAC, not the private slab
Council requires VAC consent under the NSW Roads Act when a crossing is constructed, altered or maintained. This also covers streets without kerb and gutter. Identify the boundary, verge and road before dividing the project into private paving and public access work. The council’s VAC guidance is the starting point for that decision. A driveway quotation is not council consent.
Your dwelling type selects the application route
For a single dwelling, secondary dwelling or existing development, Council Online Services handles the VAC application. A new dual occupancy, unit development or industrial or commercial proposal follows the civil-works route identified on the same council page. Ask the designer to match the crossing application to the approved development rather than selecting the simplest online option by default.
Allow for a design decision before ordering concrete
Council indicates 14 to 21 days for a straightforward application. For a complex crossing needing site-specific design, it says to allow 28 days. Steep access, multiple levels or future infrastructure work can complicate the design. These are indicative processing periods, not guaranteed appointments or construction dates. Keep the pour provisional until the determination and its conditions are available.
Broom finish matters on the public side
Section 10.2.5 of the 2026 construction specification describes plain, broom-finished, slip-resistant crossings for urban residential, rural and industrial settings. Pavers, tiles, uneven stamped finishes and exposed aggregate are not the default permitted treatments in that specification. Any specific consent or contract exception must be confirmed. An exposed aggregate driveway inside the boundary does not establish permission to continue that finish across the verge.
Check road ownership and an additional entrance
Crown and state roads require the relevant state authority’s prior consent. Do not assume the VAC form covers every road on the Coast. Council normally does not allow a second crossing; its listed exceptions include street frontage exceeding 20 metres. Meeting that frontage condition alone is not an approval. Show the existing entrance and proposed change together so the application can be assessed as a whole.
Prepare a quote scope that can follow the consent
Before asking for a final price, mark the property boundary, proposed entrance, footpath, kerb, street trees, service covers and water flow on a plan. Ask which approved drawing governs the levels and who arranges any inspection or completion paperwork specified in the consent. Use the issued consent for inspection and completion requirements, and confirm the current application charge with council. Keep crossing work and private driveway construction as separate inclusions.
VAC questions before lodgement
Does a DA or CDC include Central Coast VAC consent?
No. Council describes vehicle access crossing consent as separate from development application or complying development certificate approval. Check both before public-land work starts.
What if my street has no kerb and gutter?
Council’s VAC consent requirement still applies to constructing, altering or maintaining the crossing. The absence of kerb does not make the road reserve private land.
How long does VAC assessment take?
Council indicates 14 to 21 days for straightforward applications and 28 days for complex site-specific designs. Actual processing can vary.
Can the exposed aggregate driveway continue across the verge?
Do not assume so. The 2026 construction specification requires a plain broom-finished slip-resistant crossing in its stated settings, subject to specific consent or contract exceptions.
Source for these answers: the council guidance. Checked 14 October 2026.
For the work inside the boundary, see private driveway planning. Compare the concrete cost and scope guide and repair and resurfacing options when describing the enquiry.
Ready to price your driveway?
Free, no-obligation quotes from concreters who work your part of the Coast.
Get a Free Quote
* Indicates required field